¼¼¼Ç Æ®·¢
D4
»ý»ê/¹°·ù ºÐ¾ß (4)
|
||
È»ó°ÀÇ½Ç ¹Ù·Î°¡±â |
D4-1
Disassembly Leveling and Lot-sizing for Products with Parts Commonality and Uncertain Component Demands
D4-2
A Priority Rule based Scheduling Approach for a Flexible Manufacturing System with Multi-fixturing Pallets
D4-4
Introduction of C-RMS for Solving Reconfiguration Planning Problem in
Reconfigurable Manufacturing Systems